Slony-1 and nodes to node sync
Jamon Camisso
jamon.camisso-H217xnMUJC0sA/PxXw9srA at public.gmane.org
Wed Apr 12 13:28:22 UTC 2006
Jamon Camisso wrote:
> Chris:
>
> From what I heard tonight, it is not possible to sync a node with the
> last complete transaction common to all other nodes? I'm imagining an
> origin server that is nearly maxed out for some reason and a node or
> nodes that needs to be caught up asap.
>
> Perhaps this is too much of a hypothetical what if... Regardless, how
> hard would it be to poll other nodes and use them to sync a lagging node
> up to a point where it wouldn't be so much of a drain on the master?
Nevermind with this: I realised that the nodes don't have triggers
enabled on their tables so this idea is just me trying to understand
something that is far to technically complex for my meager abilities and
technical needs.
--
The Toronto Linux Users Group. Meetings: http://tlug.ss.org
TLUG requests: Linux topics, No HTML, wrap text below 80 columns
How to UNSUBSCRIBE: http://tlug.ss.org/subscribe.shtml
More information about the Legacy
mailing list