Voltage Reduction Test February 7 (Ontario only)
Ted
ted.leslie-Re5JQEeQqe8AvxtiuMwx3w at public.gmane.org
Tue Jan 31 16:20:38 UTC 2012
since all the stuff we use also works in USA, where they are 110? and we
are 120-125?
There should never be chance of an issue?
-tl
On 01/31/2012 11:15 AM, Walter Dnes wrote:
> This only applies to Ontario. From
> http://www.ieso.ca/imoweb/news/newsItem.asp?newsItemID=5933
>
>> The IESO will perform a voltage reduction test on Tuesday,
>> February 7, 2012. Voltage reductions are tested every 18 months
>> to simulate emergency actions available to the IESO to maintain
>> system reliability. There will be a three percent voltage reduction
>> test between 9:00 and 10:00 EST, followed by a five percent test
>> between 13:00 and 14:00 EST. The IESO will measure the electricity
>> load reduction resulting from these voltage changes. The results
>> of these tests will be used to analyze and update our emergency
>> preparedness procedures. Electricity consumers should be unaffected
>> as voltages will remain within industry standards specified for
>> equipment used by residential and commercial consumers. Consumers
>> with questions or concerns about the test should contact their
>> local distribution company. A list of local distribution companies
>> is available at http://www.ieso.ca/findutility. More information
>> about voltage reductions is available on the IESO website at
>> http://www.ieso.ca/voltagereduction or by contacting IESO Customer
>> Relations.
> We get to find out how good our power supplies and UPS systems are.
>
--
The Toronto Linux Users Group. Meetings: http://gtalug.org/
TLUG requests: Linux topics, No HTML, wrap text below 80 columns
How to UNSUBSCRIBE: http://gtalug.org/wiki/Mailing_lists
More information about the Legacy
mailing list